The client
Aster's Wake Compact is a mixed Belter/Earther/Martian religious-agricultural charter:
71 household groups, 58 children, 33 elders or medical-risk settlers, and a work mix heavy on
hydroponics, water reclamation, pressure-hab construction, medics, teachers, and toolmakers.
Their faith, the Saint Aster Fellowship, treats water as common inheritance. Their politics are
pro-Union, anti-corporate-landlord, and suspicious of anyone who says "exclusive extraction rights."
Client speakers
- Mina Velez-Adebayo, compact speaker and former Ceres water chemist.
- Brother Ilyan Petrov, Saint Aster lay preacher and household-vote wrangler.
- Nami Qarni, convoy quartermaster; knows which parts cannot be replaced.
- Rafi Sayegh, teenage mesh-runner for the convoy kids.
The convoy
| Hull | Role | People |
| Pilgrim's Measure | command / med / school | 132 |
| Candle in Vacuum | hydroponics / seed stock | 126 |
| Tamarind Ark | tools / hab membranes | 128 |
The ships are cold, quiet, and poor: good enough to coast, bad enough that a failed
first landing week could kill the charter.
Travel clock
At ~150 km/s over ~20 AU, the Sol-side dark coast takes about 231 days. The convoy is
already 143 days into that coast, leaving ~88 days to the Sol Ring.
After gate transit, Green Delta gate to Green Delta 1 is 4.89 AU. At ~90 km/s,
the settlers need about 94 more days. If the Anne Bonny leaves Medina now,
her 0.3 g crossing gives First Footing about 164-170 days on the ground.
Destination read · Green Delta 1
| Atlas | Known before the flight |
| Gate | gate-0011 · Green Delta |
| World | Green Delta 1, sealed-town candidate around buried aquifers. |
| Gravity / pressure | ~0.69 g; thin atmosphere around 0.24 atm. No open breathing. |
| Water | Trace hydrosphere; buried aquifers are the settlement prize. |
| Hazards | Dust-front cycles, weak magnetosphere, active plates, flare blackout risk, provisional microbial biology. |
| Politics | Corporate water-monopoly claim and labor-strike code in the wider charter packet. |
Footing deliverables
- Verify two aquifer sites and contamination controls.
- Select storm-sheltered first-build ground and landing ellipse.
- Lay beacon chain, abort field, and cache markers.
- Seed medical, membrane, water-treatment, food/seed, and power caches.
- Verify whether the corporate water claim is legal, abandoned, fraudulent, or armed.
- Return a plain-language settler handoff packet.
Flight loadout
- 6 sealed cache pods; 18 survey beacons; 6 hardline repeater spools.
- 2 aquifer thumpers, 1 drill head, field spectrometer, microbial quarantine kit.
- Pressure-membrane pallets, patch kits, portable shelters, spare water-plant membranes.
- Ebb and Flow if the surface can take them; drones first if the ground lies.
Pay and hooks
Gross: 31,000 Union scrip equivalent. First Footing keeps 40 percent until the company
survives its first successful delivery; crew pool is 18,600 on accepted footing report.
Campaign hooks: Vandemeer-Kline Hydrology's shell claim, a broker who may have sold the
aquifer map twice, a sick convoy child, dead labor-strike beacons, and the question of whether
the best shelter site sits on something the compact considers sacred.